我们通过将产品开发过程建模为动态系统,并在这些模型中应用控制理论的方法论,特别是非负系统理论。这种方法能够在有限的人力和物力资源条件下,实现产品开发网络中资源的最优配置。
DSM 2019参考文献
[3] | C. Zhao, M. Ogura, M. Kishida, and A. Yassine, “Optimal resource allocation for dynamic product development process via convex optimization,” Research in Engineering Design, vol. 32, no. 1, pp. 71-90, 2021. [ DOI | arXiv | http ] |
[2] | M. Ogura, J. Harada, M. Kishida, and A. Yassine, “Resource optimization of product development projects with time-varying dependency structure,” Research in Engineering Design, vol. 30, no. 3, pp. 435-452, 2019. [ DOI | arXiv | http ] |
[1] | 原田潤一, 小蔵正輝, 岸田昌子, and 杉本謙二, “設計プロジェクトにおける追加タスクの影響を最小化するためのロバスト最適化,” 日本機械学会第28回設計工学・システム部門講演会, 2018. [ DOI | http ] |