We model the product development process as a dynamic system. By applying control theory methodologies, particularly positive system theory, to this model, we aim to optimize the allocation of limited human and material resources within the product development network.
DSM 2019References
[3] | C. Zhao, M. Ogura, M. Kishida, and A. Yassine, “Optimal resource allocation for dynamic product development process via convex optimization,” Research in Engineering Design, vol. 32, no. 1, pp. 71-90, 2021. [ DOI | arXiv | http ] |
[2] | M. Ogura, J. Harada, M. Kishida, and A. Yassine, “Resource optimization of product development projects with time-varying dependency structure,” Research in Engineering Design, vol. 30, no. 3, pp. 435-452, 2019. [ DOI | arXiv | http ] |
[1] | 原田潤一, 小蔵正輝, 岸田昌子, and 杉本謙二, “設計プロジェクトにおける追加タスクの影響を最小化するためのロバスト最適化,” 日本機械学会第28回設計工学・システム部門講演会, 2018. [ DOI | http ] |